• Cy Cates

Ground Fault Prevention Demonstration, w/ VSGR - March 2019 dates are available

Updated: Jan 16


Contact me to setup a demonstration

at your office, allow 1.5hr

schedule March 4, thru March 29, 2019

Demonstration includes:

1. 3ph Electrical Load with PQ analyzer view: Volts/ph, Amps/ph, Volts ph/ph, Phasors, etc.

2. Phaseback VSGR with manual disconnect.

3. Fault simulator with disconnect.

See charts above, which show actual information from such a demonstration.

Outline of subjects discussed

  • Prevent Arc Flash, by preventing the Arcing ground fault from developing.

  • Balance voltage, phase to ground continuously, is the key.

  • Surge removal - eliminate Transients, KEMA Arc Flash test discussed.

  • PHASE ANGLE DISPLACEMENT CORRECTION demonstrated.

  • Electrical Noise, and their negative effects, removal.

  • Current Harmonics removal.

  • ENERGY EFFICIENCY IMPROVEMENT, discussion.

  • Alarm and Trip functions, discussion.

  • Keep Voltage Harmonics within IEEE519 limits, discussion.

  • Electrical system expectations with VSGR, and more.

Schedule your demonstration - 832 647 4606 Cy Cates or cycates@cycates.com

#vsgr #Lightning #standingwave #harmonicmitigation #PowerGrid #StopArcFlashDamage #reflectedwave #empprotection #ProtectthePowerGrid #ground #arcflashpreventiontransformer #AFPT #harmonicmitigatingtransformer #reduceenergycost #voltagestabilizer #empgridprotection #harmonics #SPD #emp #savethegrid #StopLightningDamage #vsgr #transient #PowerQuality #HRG #6000Varcflashtest