Cy Cates
Quality Power Case Study 1
Updated: Jan 29, 2021
A Michigan Manufacturing Company had a Problem with downtime, caused by equipment malfunction. The study determined that Drives and Controls were faulting, due to Voltage imbalance (single phase sags). Download 2pg pdf.

Action item: Phaseback VSGR was installed which solved the problems.
Results: Efficiency, reliability, and safety remain significantly improved.
Call for a demonstration Cy Cates cycates@cycates.com 832 647 4606
#Lightning #StopArcFlashDamage #StopLightningDamage #PowerQuality #arcflashprevention #SPD #grounding #savemoneyonelectricity